Torvenkylä wind farm Kalajoki

  • Asiakkaan nimi hankkeisiin: Eneriequelle Gmbh
  • Valmistuminen: 2022
For Suvic, the 7 turbine project included the entire infrastructure construction. Unlike in common foundations, over 8-meter concrete elevations were built on top of the foundations to improve the wind farm's electricity production.

Continue reading

Metsälamminkangas wind farm Vaala

  • Asiakkaan nimi hankkeisiin: OX2
  • Valmistuminen: 2021
Suvic was in charge of the earthworks, foundations, and internal cabling of the wind farm located in Vaala, Northern Ostrobothnia. The wind farm was the third largest in Finland, and it consisted of 24 wind turbines. Suvic started working in Vaala in April 2020, and its part in the project was largely finished during spring 2021.

Continue reading

Karhunnevankangas wind farm Pyhäjoki

  • Asiakkaan nimi hankkeisiin: wpd Finland
  • Valmistuminen: 2021
Suvic was responsible for the construction of the project's infrastructure, which included the wind farm road, hardstands, foundations, and cabling. Suvic was also responsible for the design of these units. The 8 wind turbines had a total height of 240 m and a total capacity of 44 MW.

Continue reading

Lakiakangas 3 wind farm Isojoki

  • Asiakkaan nimi hankkeisiin: CPC Finland | Helen
  • Valmistuminen: 2021
For Suvic Oy, the project included the design of foundations of wind turbines and the internal grid with their implementations. The wind farm consists of 20 4.3 MW wind turbines with a total capacity of 86 MW.

Continue reading

Nuolivaara wind farm Kemijärvi

  • Asiakkaan nimi hankkeisiin: wpd Finland
  • Valmistuminen: 2021
Suvic was responsible for building the foundations. A total of 17 wind turbines were built in the wind farm. The power plants planned in the area have a capacity of 5-6 MW and a total height of 250 meters.

Continue reading

Vermon AWHP Espoo

  • Asiakkaan nimi hankkeisiin: Fortum
  • Valmistuminen: 2021
Suvic built the foundations for the air-to-water heat pump plant in Vermo. Suvic executed the project management during the civil engineering and foundation work.

Continue reading

Puskakorpi wind farm Pyhäjoki

  • Asiakkaan nimi hankkeisiin: Foresight Group
  • Valmistuminen: 2021
Suvic was in charge of a turnkey project, which included all infrastructure works for 16 power plants. The power plants have a hub height of 161 meters and have a total height of 250 meters. The capacity of one power plant is 5.5 MW, which means that the total capacity of the park is 88 MW.

Continue reading

Kalax wind farm Närpes

  • Asiakkaan nimi hankkeisiin: Fortum
  • Valmistuminen: 2020
The project management contract covered nearly all construction work, such as earthworks, foundations, and other infrastructure, but it excluded turbine deliveries and installation. The work started in early summer 2019, and Suvic completed its part of the project in April 2020.

Continue reading

Paskoonharju 2 wind farm Teuva

  • Asiakkaan nimi hankkeisiin: EPV
  • Valmistuminen: 2020
Suvic is responsible for project's foundation works. The project included the design and construction of 21 gravity foundations for the wind farm. The power plants to be installed on the foundations are 155 meters high. The total capacity in the park is 124 MW and the estimated annual production is 400,000 MWh.

Continue reading

Elektroniikkatie 4
90590 Oulu, Finland
+358 20 741 8840

Billing

Please send invoices preferably by e-invoice. The invoice must include the site number and code number (littera) as a reference. The invoice should be addressed to each site separately.

Suvic Oy

We apply a reverse charge to VAT for the purchase of construction services.

Online invoice address: 003728198741
Operator: 003721291126 (Maventa)
E-mail billing: This email address is being protected from spambots. You need JavaScript enabled to view it.

Suvic AB

Online invoice address: 5594260944
Operator: Apix Messaging (APIXSE)
E-mail billing: This email address is being protected from spambots. You need JavaScript enabled to view it.