Pjelax-Böle-Kristinestad Norr wind farms

  • Asiakkaan nimi hankkeisiin: Fortum
  • Valmistuminen: 2023
Suvic worked as the main contractor in the Pjelax-Böle and Kristinestad Norr wind farms. The contract includes the repair works and construction of roads, the construction of hardstands and 56 foundations. Suvic also includes underground cabling work for the internal grid and transmission line, as well as civil and casting works for the substation. The total power of the park is 380 MW and the annual yield has been calculated to be around 1.1 TWh.

Continue reading

Sarvisuo wind farm Simo

  • Asiakkaan nimi hankkeisiin: TuuliWatti
  • Valmistuminen: 2020
Suvic was responsible for the design and construction of the foundations of Finland's second-highest wind farm. The wind park was located in Simo's Sarvisuo area in southwestern Lapland. A total of 27 wind turbines were built in the wind park. For Suvic, work began in May 2020 and was completed by the end of 2020.

Continue reading

Merkkikallio wind farm Vaasa

  • Asiakkaan nimi hankkeisiin: OX2
  • Valmistuminen: 2022
Suvic was in charge of the infrastructure construction of the wind farm, including roads, cabling, and foundations. There are 15 power plants in the area, with a nominal power of 5.5 MW for each power plant, and the wingtip runs at a maximum of 240 meters.

Continue reading

Puutikangas wind farm Sievi

  • Asiakkaan nimi hankkeisiin: OX2
  • Valmistuminen: 2022
Suvic was responsible for the construction of the project's infrastructure, which included the wind farm road, hardstands, foundations, and cabling. Suvic was also responsible for the design of these units. The 8 wind turbines have a total height of 240 m and a total capacity of 44 MW.

Continue reading

Torvenkylä wind farm Kalajoki

  • Asiakkaan nimi hankkeisiin: Eneriequelle Gmbh
  • Valmistuminen: 2022
For Suvic, the 7 turbine project included the entire infrastructure construction. Unlike in common foundations, over 8-meter concrete elevations were built on top of the foundations to improve the wind farm's electricity production.

Continue reading

Metsälamminkangas wind farm Vaala

  • Asiakkaan nimi hankkeisiin: OX2
  • Valmistuminen: 2021
Suvic was in charge of the earthworks, foundations, and internal cabling of the wind farm located in Vaala, Northern Ostrobothnia. The wind farm was the third largest in Finland, and it consisted of 24 wind turbines. Suvic started working in Vaala in April 2020, and its part in the project was largely finished during spring 2021.

Continue reading

Elektroniikkatie 14
90590 Oulu, Finland
+358 20 741 8840

Billing

Please send invoices preferably by e-invoice. The invoice must include the site number and code number (littera) as a reference. The invoice should be addressed to each site separately. We apply a reverse charge to VAT for the purchase of construction services.

E-invoice address: 003728198741
Operator: Maventa (EDI code 003721291126)
Email: This email address is being protected from spambots. You need JavaScript enabled to view it.

By mail:
Suvic Oy
28198741
PL 100
80020 Kollector Scan